Huawei Nexus 6P :: Any Way To Change Order Of Navbar Buttons
Nov 8, 2015
I am loving my 6P, but I almost drop it all the time trying to reach across the screen and hit the back button while holding the phone one handed.
I think this wouldn't be nearly as much of a problem if I could move the back button to the far right position (this is where I had it on my G3 and it was soo much more comfortable to use).
Are there any root/non-root/modifications I can use to rearrange the buttons?
I have the bootloader unlocked and would happily root if it would enable the ability to move the buttons
I know Xposed add-ons will add this functionality eventually, but that could be at least a few weeks/months away.
View 2 Replies
ADVERTISEMENT
Feb 21, 2016
is there are app or a instructions on how to change /modify softkeys (navbar keys) for the nexus 6p?
View 5 Replies
View Related
Nov 10, 2015
I have used a 3 dot navbar menu to access settings quickly on my previous phone. Is there a way to enable it on our phone?
View 2 Replies
View Related
Dec 10, 2015
Are there any mods that allow it? There were a few that don't work with MM so I am looking for an alternative.Would be nice if Google defaulted to that instead of the solid black bar. I can do it from within my music player app. It just fills the screen more and makes it look classier in my opinion.I'd even go for an almost transparent navbar as well.
View 9 Replies
View Related
Nov 24, 2015
I'm not sure what I did, but now I have two onscreen buttons for zoom (Z- and Z+).URL...I'd like to turn them off, but I can't figure out how.
View 3 Replies
View Related
Nov 3, 2015
I have tried apple and samsung headphones that have volume controls on the headphone wire and both of them pause audio play back if you try to turn the volume up or down. I tried this in Google Music and Beyond Podcast and same issue. If I press volume up then playback pauses.
View 1 Replies
View Related
Nov 1, 2015
Any way to swap the position of the recents and back buttons?
View 9 Replies
View Related
Nov 5, 2015
It's weird. I'm not talking about DND. Seems as though every time I put ringer on vibrate it reverts back to sound after a while. Same with the media volume. I don't get it?!?!?
View 2 Replies
View Related
Dec 29, 2015
I'm having issues with DPI change, I used ADB to change the DPI using a simple adb shell wm density 460 && adb reboot, all good, only issue is a few things are.. weird.. For instance the "top apps" icon, little blue thinggy in the playstore is awkwardly big, it's larger then the font, but I didn't use the phone stock so I don't know if that's just how marshmallow is or if that's a dpi problem. I also noticed when loading The Sims FreePlay, the EA boot logo it extremely over scanned, the letters EA barely fit on the screen, the eBay app, the user display picture is cut off and only shows the bottom right corner on an icon that's huge and again over sized, as well as snapchat sending all of my snaps with extremely small font, yet on my screen before sending they look just fine.
So after looking into this further, the build.prop was never changed, it still says dpi 560, but I know for system files I need to mount /system in order to write to it without root. So I booted to recovery as that allows me write access to system, mounted system, says mounted /system at the bottom of the log, open adb, run adb devices, nothing comes up, it's not found, reboot phone, run adb devices, works fine. What's the deal? I can't get the 6p to work from recovery when mounting /system, it says it's mounted but on the computer end nothing is happening.
I also want to keep this phone as stock as possible, kind of a purist douche bag like that so I don't want to run TWRP, or at least I'm not committed to this DPI change being this important that I want a custom recovery.why I can't mount /system in the stock recovery? or rather, why I can mount it but why it's not working?
View 2 Replies
View Related
Feb 23, 2016
I'm currently on Franco Kernel but want to change to ElementalX kernel.
I've read that you can't just install the new kernel over the old kernel is that true?
Will I need to do wipe my device in order to install?
View 3 Replies
View Related
Dec 17, 2015
Is it possible?
View 2 Replies
View Related
Jan 27, 2016
Best rooting method? I don't need to change the ROM, but the precious root method doesnt seem to have survived a reboot. (I used CFAutoroot). Is it necessary to change recovery maybe that's why I had issue?
View 2 Replies
View Related
Nov 16, 2015
How do you change the font on this device? Through the usual font app on the play store ?
View 10 Replies
View Related
Nov 9, 2015
I can not find it, weird?
I want the indicator in pourcentage?
View 3 Replies
View Related
Dec 22, 2015
I'm trying to make changes to the Android/obb folder but it just fails. I tried three different root explorer and nothing seems to work. It has rw rw r permissions. Is it because of systemless root ?
View 1 Replies
View Related
Nov 1, 2015
Su wm size 1080x1920 it brings the error that I can't change while system is running is there a work around? How do I send a script if the system is turning off?
View 2 Replies
View Related
Jan 13, 2016
How to change the COLOR of icons on status bar...
View 1 Replies
View Related
Dec 24, 2015
Just as the title says, I tried messing with the dpi, went from 400 to 480, all of them cause chrome to go into tablet mode with the tiny tabs/buttons at the top of the screen. I'm using the PureNexus rom.
Gmail app doesn't allow me to click some embedded links and some links are just plain text and not highlighted/underlined in blue making them clickable.
View 6 Replies
View Related
Dec 4, 2015
I am thinking of keeping my phone stock given (Android Pay, Security Updates, Work requirements for email/messages). Is there any way to update the hosts file without unlocking the bootloader and installing TWRP? I just want to get rid of the ads as they are soo annoying for non-donate/IAP/Pro-version apps.
View 3 Replies
View Related
Feb 21, 2016
I followed the instructions on this archived reddit post with my nexus 6p. "How to change the trigger word for google now" (no direct link because I am too new.) I cannot seem to get it working.
I have tried systematically switching on and off options in AutoVoice, e.g., "run in foreground" and "alternative method", and substituting other apps in place of "VoiceSearchActivity" in Tasker, e.g., "DspHotwordVoiceSearchActivity", but no luck.The hardware and up-to-date Google Now app in my nexus 6p should be compatible with this method.
View 2 Replies
View Related
Jan 12, 2012
So, got excited about the MotoACTV this past Saturday and bought online through Motorola. Realized soon after that my local REI had it in stock and I had a xmas gift certificate. Went to REI and purchased it - (Canceled my order for the Garmin 910XT in the process) Went back to the site to try and cancel my order but the 'Cancel items or order' button on my order page wasnt' functional. No biggie, I'll call. After being passed around to the same 3 depts TWICE, I was finally told the ecommerce section was closed for the weekend. Once again, I understand that.I then call on Monday, they tell me the order hasn't yet shipped but I'm not allowed to cancel it at that point. Don't quite understand and getting a bit frustrated at this point but whatever, I'll deal. Customer rep tells me that they'll issue a return slip and email it to me.
OK, I'm good with that.Wednesday comes and still no email with return slip. I call, go through the same 3 depts again and get someone else who tells me that it takes a while to get the return slip but I'll have it within 24 hours.24 hours goes by, I call again and get hung up on 3 times in the process before I can ever get to anyone. Once I get someone on the line, they tell me that it should be to me within the next couple of days... A RETURN SLIP?Once I finally lost my temper a bit, they said it would be 'escalated' and that I should be receiving it within a few hours... we'll see. They also let me know that I could not return it without the receipt.Meanwhile, I've completely soured on the one that I purchased and I'm considering returning it as well and changing my order back to the Garmin. By the way, I called Garmin's support team just to compare... night and day!
View 6 Replies
View Related
Sep 2, 2010
On my HTC Legend all my sms messages are shown in the wrong order. I get the oldest one first which is very annoying. How do I change the sms sort order?
View 6 Replies
View Related
Jun 20, 2010
Currently my blackberry sorts email in the order by when it was downloaded. How can i change it so that it displays in the order which they were sent or recieved by the mail server ? I think this is the default behavior by outlook.
View 3 Replies
View Related
May 9, 2012
I get many email messages a day; when I click the "messages folder" I would like for the most recent message or event (e.g. an sms text or a telephone call) to be the first one, instead my Blackberry insist on showing messages that are several days old, forcing me to slide from page to page to get to the top. .
View 5 Replies
View Related
Oct 22, 2011
how can i change my text messages so they come up in order...they are currently coming up everything i say at the top of the conversation and everything from the other person at the bottom.. if that makes sense i think a setting much of been changed because they were coming up in oreder to begin with.
View 8 Replies
View Related
Dec 8, 2014
How can the order of messages displayed be changed? Can the time and dates be removed?
Info:
iPhone 5s, iOS 8
View 1 Replies
View Related
Jan 25, 2010
I've searched the forums but I don't see this issue raised by anyone.I upload photos to my Storm 2 from my computer using BB Device Manager. Is there any way to change the display order of the photos once they're uploaded to my Storm 2? The display order on the computer doesn't seem to match the way that they display on the Storm 2 and to tell the truth it doesn't seem to have much to do with the file name either.
View 2 Replies
View Related
May 11, 2012
Is it possible to change the order of email Inboxes or Accounts once they are created?
Info:
iPhone 4, iOS 5.1.1
View 1 Replies
View Related
May 30, 2012
Is there any problem if i change the order of the icons in the iPhone 4 home screen of iphone 4 (iOS 5.1.1)
I heard that the battery consumption is rather different with some icons in the home screen..
Info:
iPhone 4, iOS 5.1.1
View 1 Replies
View Related
Nov 23, 2012
How do I change the order the music is played in? When I sync a playlist from iTunes, the music does not play in order. I can't seem to figure out what order it IS playing. No where do I see playlist options.
View 2 Replies
View Related
Sep 15, 2011
Is there any way to change the preferred order of WiFi networks? My office has two WiFi networks, one for my office and one for the conference room down the hall. When I added the network for the conference room I found that when I'm in the office the phone keeps connecting to it, even though the signal is much weaker than the office network. I ended up just removing it from the list, however, when I'm in the conference room I have to re-add it, which is a pain because there's a long password. On my Windows laptop it's easy to just change the order and it will connect to the one closest to the top of the list, but I can't find anything like that on my Photon. It seems like it would be something pretty simple that would have been built-in.
View 3 Replies
View Related