IPhone 5s :: Any Way To Change Order Of Messages Displayed?
Dec 8, 2014How can the order of messages displayed be changed? Can the time and dates be removed?
Info:
iPhone 5s, iOS 8
How can the order of messages displayed be changed? Can the time and dates be removed?
Info:
iPhone 5s, iOS 8
I want my SMS & MMS messages sent and received displayed in order, showing the latest one on top. Right now they are coming in all over the place. How can this be fixed?
View 8 Replies View Relatedhow can i change my text messages so they come up in order...they are currently coming up everything i say at the top of the conversation and everything from the other person at the bottom.. if that makes sense i think a setting much of been changed because they were coming up in oreder to begin with.
View 8 Replies View RelatedIs it possible to change the order of email Inboxes or Accounts once they are created?
Info:
iPhone 4, iOS 5.1.1
Is there any problem if i change the order of the icons in the iPhone 4 home screen of iphone 4 (iOS 5.1.1)
I heard that the battery consumption is rather different with some icons in the home screen..
Info:
iPhone 4, iOS 5.1.1
How can I stop incoming messages being displayed on the main screen of the 4S?
Info:
iOS 5
I noticed today that some of my text messages lost their time order. A few of them I sent yesterday and now they appear with yesterdays timestamp but, they are arranged after the texts I've sent today. Why is this?
Info:
iPhone 5s, iOS 7.1.1
I've recently updated the os on my bb. Since doing so, my sms now displayed like the bbm is displayed, which is causing me to send more texts! Is there anyway I can change the display to the standard SMS display?
View 4 Replies View RelatedI have a web-based email address with magma and I want the reply address to display a different email name. How can I do this? The editing options in my email setup don' t allow.
View 1 Replies View RelatedSo, got excited about the MotoACTV this past Saturday and bought online through Motorola. Realized soon after that my local REI had it in stock and I had a xmas gift certificate. Went to REI and purchased it - (Canceled my order for the Garmin 910XT in the process) Went back to the site to try and cancel my order but the 'Cancel items or order' button on my order page wasnt' functional. No biggie, I'll call. After being passed around to the same 3 depts TWICE, I was finally told the ecommerce section was closed for the weekend. Once again, I understand that.I then call on Monday, they tell me the order hasn't yet shipped but I'm not allowed to cancel it at that point. Don't quite understand and getting a bit frustrated at this point but whatever, I'll deal. Customer rep tells me that they'll issue a return slip and email it to me.
OK, I'm good with that.Wednesday comes and still no email with return slip. I call, go through the same 3 depts again and get someone else who tells me that it takes a while to get the return slip but I'll have it within 24 hours.24 hours goes by, I call again and get hung up on 3 times in the process before I can ever get to anyone. Once I get someone on the line, they tell me that it should be to me within the next couple of days... A RETURN SLIP?Once I finally lost my temper a bit, they said it would be 'escalated' and that I should be receiving it within a few hours... we'll see. They also let me know that I could not return it without the receipt.Meanwhile, I've completely soured on the one that I purchased and I'm considering returning it as well and changing my order back to the Garmin. By the way, I called Garmin's support team just to compare... night and day!
On my HTC Legend all my sms messages are shown in the wrong order. I get the oldest one first which is very annoying. How do I change the sms sort order?
View 6 Replies View RelatedHow to change the font size of the time on my Xperia Z5. I want to make it smaller, or remove it because it appears at the top of the screen as well.
View 1 Replies View RelatedCurrently my blackberry sorts email in the order by when it was downloaded. How can i change it so that it displays in the order which they were sent or recieved by the mail server ? I think this is the default behavior by outlook.
View 3 Replies View RelatedI get many email messages a day; when I click the "messages folder" I would like for the most recent message or event (e.g. an sms text or a telephone call) to be the first one, instead my Blackberry insist on showing messages that are several days old, forcing me to slide from page to page to get to the top. .
View 5 Replies View Relatedordered an iphone 4s yesterday, but i've still got no confirmation mail. is it because it's weekend? i admit i'm starting to get a bit nervous, because when checking my order list there are no orders on my user neither. though, i signed up when completing the order of the phone. did it take a while before you got the confirmation mail or did I really mess this up?
Info:
iPhone 4S
I've searched the forums but I don't see this issue raised by anyone.I upload photos to my Storm 2 from my computer using BB Device Manager. Is there any way to change the display order of the photos once they're uploaded to my Storm 2? The display order on the computer doesn't seem to match the way that they display on the Storm 2 and to tell the truth it doesn't seem to have much to do with the file name either.
View 2 Replies View RelatedHow do I change the order the music is played in? When I sync a playlist from iTunes, the music does not play in order. I can't seem to figure out what order it IS playing. No where do I see playlist options.
View 2 Replies View RelatedI am loving my 6P, but I almost drop it all the time trying to reach across the screen and hit the back button while holding the phone one handed.
I think this wouldn't be nearly as much of a problem if I could move the back button to the far right position (this is where I had it on my G3 and it was soo much more comfortable to use).
Are there any root/non-root/modifications I can use to rearrange the buttons?
I have the bootloader unlocked and would happily root if it would enable the ability to move the buttons
I know Xposed add-ons will add this functionality eventually, but that could be at least a few weeks/months away.
Is there any way to change the preferred order of WiFi networks? My office has two WiFi networks, one for my office and one for the conference room down the hall. When I added the network for the conference room I found that when I'm in the office the phone keeps connecting to it, even though the signal is much weaker than the office network. I ended up just removing it from the list, however, when I'm in the conference room I have to re-add it, which is a pain because there's a long password. On my Windows laptop it's easy to just change the order and it will connect to the one closest to the top of the list, but I can't find anything like that on my Photon. It seems like it would be something pretty simple that would have been built-in.
View 3 Replies View Relatedis there a way that i can change the settings on the Messages and send like emotion or change the theme on it?
Info:
iPhone 4, iOS 5.1
I ordered this on the 15th at about 5:30am, a little over an hour after it was released. I printed out the confirmation page and I have the confirmation page. Nothing shows up in my orders, and when I type to search my order using my phone number or order number, nothing comes up.Has this happened to anyone else?I have to call them when they open!Also, I don't have a confirmation e-mail, because it's a different account owner with a different e-mail.
View 22 Replies View RelatedI have Windows phone 8.1 installed and I need to do a factory reset in order to change Microsoft account and I am just wondering if I do this, I will have to downloaded the Preview for Develoepers app again from the store, right?
View 7 Replies View RelatedI've recently upgraded to the new Blackberry Bold and all of a sudden my text messages seem to be out of sync.For example if I text Friend A, they text back to which I again reply - both my messages will be at the top... So if you end up having a text conversation with someone, every single one of mine will be in one place and below will be theirs. When you are reading back it is confusing as obviously you didn't text five times with no reply and vice versa all received messages appear to have been "received one minute ago" rather than the usual at 17.50 or whatever...
View 1 Replies View RelatedI want my SMS & MMS messages sent and received displayed in order, showing the latest one on top. Right now they are coming in all over the place.
View 9 Replies View RelatedI recently deleted 2000 messages from my inbox using the mark all/delete function. It seems though after this process my Xpress Music has started playing up. Text messages are only being received when i switch the phone off then on again they come through. Also, if i have missed a call and hit the log or - show missed calls button, the phone says no missed calls/ no information.Has anyone else experienced this problem and know of a fix?
View 8 Replies View RelatedI just got a Motorola Defy (the Scandinavian version, with Android 2.2.2), and I'm very happy with it so far. However, there is a strange little bug in it: Every time I type ":-)" in a text message, it will be replaced with a "sad face" icon (). And every time I type a capital letter "B", it is replaced with a "sunglasses" icon () in the message.
View 2 Replies View Related I'm curious if anyone else is experiencing this on their BIONIC.
I have vibrate on text message receipt turned on. My phone will vibrate indicating I have received a message but there is nothing in the notification bar or in the list of text messages. I know that it is a failure to receive because I often text people asking them if they just texted me and I almost always find who it was. They resend and I get it. I can't seem to find a trend as to what the root cause may be. Is this a known issue that is expected to get addressed in one of the upcoming patches or do I need to report it to Motorola to look into?
My Samsung S5 is receiving text messages out of order. If within a conversation I respond in a couple different messages. the next time the person I am talking to responds it is above my response but, should be below it. Is there any way I can correct this?
View 24 Replies View RelatedI am trying to get a definitive answer as have been researching this for weeks and despite my best efforts still have no solution.I am using the fantastic N900 (well done Nokia!) and would like all my music on the device. All efforts so far have transferred music ok but album tracks always appears in alphabetical order in the music player as opposed to the album track order(not much good). This is despite careful tagging and trying with Windows Media Player, Media Monkey & Songbird to see if any work best.
I found out today that this might be due to the file being a .wma file. All my music is ripped to my PC in .wma as in my experience I find the quality vs file size is great and better by far than .mp3.Today I ripped a CD with WMP as .mp3 and after sync the track order was correct (although I do not want to use WMP through choice and certainly not .mp3, let alone re rip my entire CD Collection), my preference would be Media Monkey or Songbird with .wma.
Is this a bug or N900 problem? (I know they are different but it worked fine on N97 and N95 8gb previously with MM and .wma) Can anyone help? or even offer a recommendation or suggestion as to what they think is best format, application or way to have music on the N900 etc.
I love car mode on my S5, except for this stupid bug where it plays music in alphabetical order instead of track order when you ask it to play an album. If I say the same command using the "OK Google" feature outside of car mode, that works just fine. The metadata on the mp3 files have the correct track info.
View 1 Replies View RelatedHow do you change font size on iPhone 4 for messages.
Info:
iPhone 4, iOS 5, None