IPhone :: How To Change Order Of Email Inboxes And Accounts

May 11, 2012

Is it possible to change the order of email Inboxes or Accounts once they are created?

Info:
iPhone 4, iOS 5.1.1

View 1 Replies


ADVERTISEMENT

IPhone :: No Confirmation Email Or Order In Order List?

May 20, 2012

ordered an iphone 4s yesterday, but i've still got no confirmation mail. is it because it's weekend? i admit i'm starting to get a bit nervous, because when checking my order list there are no orders on my user neither. though, i signed up when completing the order of the phone. did it take a while before you got the confirmation mail or did I really mess this up?

Info:
iPhone 4S

View 7 Replies View Related

IPhone :: Certain FAN Accounts Exempt From Tax / Premier Store Order

Jun 17, 2010

I thought maybe last year i got lucky and they didn't add the tax on the 3GS, i only got charged 199, the tax never ended up being on my bill. I would have noticed because i am a lucky resident of California, and the tax would have been $68.25, since tax here is 9.75%. I ordered the iPhone 4 early Tuesday morning through the Premier Store, and no charges showed up until today, but it is for the same amount $199. BTW, this is an Individual FAN account for USPS.

View 11 Replies View Related

BB Curve 8500 :: Mixing Inboxes While Receiving Email?

Mar 11, 2010

I have a Blackberry Curve 8530 with 5.0.xx installed. I just set up my IMAP Gmail account on my BB and have noticed a big problem when receiving messages. Basically I get SOME of my mail in my email folder and SOME of it in my MESSAGES folder - just to make this clear both folders receive different messages that should be routing to my email folder. I tried turning off receiving my emails in my MESSAGES folder - but then I'll get a flag stating there is an unread message in my EMAIL folder - but NOTHING'S THERE. So I then go back in to Messages>options>Email settings and click the box to have Messages receive my emails too and VOILA - there's the hidden email!

So to sum this up - I can't get all my emails unless I have Messages set to receive my email as well because it receives some and my email folder receives some when my email folder should be receiving ALL of them.

I found some help in the Blackberry Answers but it describes going into menus that I don't have to reroute the messages to my inbox. So what do I do? Is this common? Is something corrupt? I'd like just to receive ALL my emails in my EMAIL folder.

View 40 Replies View Related

IPhone 5s :: Any Way To Change Order Of Messages Displayed?

Dec 8, 2014

How can the order of messages displayed be changed? Can the time and dates be removed?

Info:
iPhone 5s, iOS 8

View 1 Replies View Related

IPhone :: Change The Order Of The Icons In The 4 Home Screen?

May 30, 2012

Is there any problem if i change the order of the icons in the iPhone 4 home screen of iphone 4 (iOS 5.1.1)

I heard that the battery consumption is rather different with some icons in the home screen..

Info:
iPhone 4, iOS 5.1.1

View 1 Replies View Related

IPhone :: Delete Email From 4s Without Deleting Email From YahooMail Or Gmail Accounts?

Mar 28, 2012

How do I delete email from my Iphone without deleting email from my YahooMail or Gmail accounts

Info:
iPhone 4S, iOS 5.1

View 2 Replies View Related

IPhone :: Prevent Personal Email Accounts (yahoo, Gmail) From Accessing My Work Email Contact List?

Jul 5, 2012

On iPhone 4s, how do I prevent personal email accounts (yahoo, gmail) from accessing my work email contact list? I want to keep my work contact list private.

Info:
iPhone 4S, iOS 5.1.1

View 1 Replies View Related

IPhone :: Can Receive All Email But Can't Send From Certain Email Accounts

Apr 4, 2012

I am having email problems. I have several email accounts. I receive email on all of them, but can't send on all of them. Not even a reply. The email accounts that work are gmail and [URL]The accounts that don't send are: 1 account hosted by GoDaddy, and a few accounts on my 2 domains [URL] and [URL] all of these accounts work fine on my laptop via outlook 2007. The place that houses my 2 domains said they don't know why I am having this problem.

Info:
Windows 7

View 4 Replies View Related

IPhone :: Have 3 Accounts Of Email In 4s And Trying To Send A Picture To It Using An Email?

Apr 11, 2012

i have 3 accounts of email in my iPhone 4s and I'm trying to send a picture to it using my email, how do i know which email account is I'm using

Info:
iPhone 4S, iOS 5.1

View 2 Replies View Related

Motorola Motoactv :: Cancel Order But The 'Cancel Items Or Order' Button On Order Page Wasnt' Functional?

Jan 12, 2012

So, got excited about the MotoACTV this past Saturday and bought online through Motorola. Realized soon after that my local REI had it in stock and I had a xmas gift certificate. Went to REI and purchased it - (Canceled my order for the Garmin 910XT in the process) Went back to the site to try and cancel my order but the 'Cancel items or order' button on my order page wasnt' functional. No biggie, I'll call. After being passed around to the same 3 depts TWICE, I was finally told the ecommerce section was closed for the weekend. Once again, I understand that.I then call on Monday, they tell me the order hasn't yet shipped but I'm not allowed to cancel it at that point. Don't quite understand and getting a bit frustrated at this point but whatever, I'll deal. Customer rep tells me that they'll issue a return slip and email it to me.

OK, I'm good with that.Wednesday comes and still no email with return slip. I call, go through the same 3 depts again and get someone else who tells me that it takes a while to get the return slip but I'll have it within 24 hours.24 hours goes by, I call again and get hung up on 3 times in the process before I can ever get to anyone. Once I get someone on the line, they tell me that it should be to me within the next couple of days... A RETURN SLIP?Once I finally lost my temper a bit, they said it would be 'escalated' and that I should be receiving it within a few hours... we'll see. They also let me know that I could not return it without the receipt.Meanwhile, I've completely soured on the one that I purchased and I'm considering returning it as well and changing my order back to the Garmin. By the way, I called Garmin's support team just to compare... night and day!

View 6 Replies View Related

IPhone :: Mail App - Disable Notifications For 1 Of 2 Inboxes?

Jul 20, 2010

I have my work email thru Exchange and my personal email thru gmail, both routed to my Universal Inbox on my iP4. I only want to be notified of my personal emails. Is there a way to disable the notifications for just my work emails? Seems there's not an individual option I've found. I also thought of disabling Push on the work account, but it seems that's not individual either...

View 5 Replies View Related

HTC Legend :: How To Change Sms Sort Order

Sep 2, 2010

On my HTC Legend all my sms messages are shown in the wrong order. I get the oldest one first which is very annoying. How do I change the sms sort order?

View 6 Replies View Related

IPhone :: Cannot Send Email Despite Settings Being In Order

Jul 2, 2012

I cannot send mails...I keep getting message that recipient was rejected by server because the user is unknown. All settings seem to be in order. Sent messages up til recently!

Info:
iPhone 4

View 1 Replies View Related

IPhone :: Stop 'Mail' On 4s Checking All Inboxes When Opened?

Apr 30, 2012

I have 3 email accounts set up. in 'Mail' the following is displyaed:

"Mailboxes
Inboxes
- All Inboxes
- email account 1

[code]....

But as soon as 'Mail' is opened it checks all the accounts. Apparently it doesn't work this way for everyone: it seems a little pointless to have separate inboxes and then ignore them and default to downloading them all every time anyway. The accounts are all sey to "manual" under "fetch new data".

Info:
iPhone 4S, iOS 5.1

View 1 Replies View Related

BB Bold :: Change Sort Order Of Emails?

Jun 20, 2010

Currently my blackberry sorts email in the order by when it was downloaded. How can i change it so that it displays in the order which they were sent or recieved by the mail server ? I think this is the default behavior by outlook.

View 3 Replies View Related

BB Storm :: Change Message Order Of Appearance?

May 9, 2012

I get many email messages a day; when I click the "messages folder" I would like for the most recent message or event (e.g. an sms text or a telephone call) to be the first one, instead my Blackberry insist on showing messages that are several days old, forcing me to slide from page to page to get to the top. .

View 5 Replies View Related

BB Torch :: How To Change Text Messages So They Come Up In Order

Oct 22, 2011

how can i change my text messages so they come up in order...they are currently coming up everything i say at the top of the conversation and everything from the other person at the bottom.. if that makes sense i think a setting much of been changed because they were coming up in oreder to begin with.

View 8 Replies View Related

BB Storm 9500 :: How Can I Change Display Order Of Photos?

Jan 25, 2010

I've searched the forums but I don't see this issue raised by anyone.I upload photos to my Storm 2 from my computer using BB Device Manager. Is there any way to change the display order of the photos once they're uploaded to my Storm 2? The display order on the computer doesn't seem to match the way that they display on the Storm 2 and to tell the truth it doesn't seem to have much to do with the file name either.

View 2 Replies View Related

Motorola Motoactv :: Change The Order The Music Is Played In?

Nov 23, 2012

How do I change the order the music is played in? When I sync a playlist from iTunes, the music does not play in order. I can't seem to figure out what order it IS playing. No where do I see playlist options.

View 2 Replies View Related

Huawei Nexus 6P :: Any Way To Change Order Of Navbar Buttons

Nov 8, 2015

I am loving my 6P, but I almost drop it all the time trying to reach across the screen and hit the back button while holding the phone one handed.

I think this wouldn't be nearly as much of a problem if I could move the back button to the far right position (this is where I had it on my G3 and it was soo much more comfortable to use).

Are there any root/non-root/modifications I can use to rearrange the buttons?

I have the bootloader unlocked and would happily root if it would enable the ability to move the buttons

I know Xposed add-ons will add this functionality eventually, but that could be at least a few weeks/months away.

View 2 Replies View Related

IPhone :: 4 Email Accounts Not Available

May 5, 2012

I haven't been able to send email in quite a while. I can recieve but not send (iPhone 4 with most recent iOS), the error I recieve is "the connection to the outgoing server "mail.charter.net" [my correct server in Outlook] failed." .

Info:iPhone 4, iOS 5.1

View 1 Replies View Related

Motorola Photon 4G :: Change Preferred Order Of WiFi Networks

Sep 15, 2011

Is there any way to change the preferred order of WiFi networks? My office has two WiFi networks, one for my office and one for the conference room down the hall. When I added the network for the conference room I found that when I'm in the office the phone keeps connecting to it, even though the signal is much weaker than the office network. I ended up just removing it from the list, however, when I'm in the conference room I have to re-add it, which is a pain because there's a long password. On my Windows laptop it's easy to just change the order and it will connect to the one closest to the top of the list, but I can't find anything like that on my Photon. It seems like it would be something pretty simple that would have been built-in.

View 3 Replies View Related

IPhone :: AT&T / Pre Order Not Showing In Order Status

Jun 16, 2010

I ordered this on the 15th at about 5:30am, a little over an hour after it was released. I printed out the confirmation page and I have the confirmation page. Nothing shows up in my orders, and when I type to search my order using my phone number or order number, nothing comes up.Has this happened to anyone else?I have to call them when they open!Also, I don't have a confirmation e-mail, because it's a different account owner with a different e-mail.

View 22 Replies View Related

IPhone :: All Email Accounts Go To One Inbox?

Jan 30, 2010

Is it possible to have all email accounts go to one inbox? Backing out to different accounts can sometime be a pain.

View 8 Replies View Related

IPhone :: Two Yahoo Email Accounts On 4s?

Mar 24, 2012

I'm trying to add second Yahoo email account on iPhone but keeps asking me to go onto Yahoo and verify but doesn't say how. I have two yahoo accounts on iPad with no problems.

Info:
iPhone 4S, iOS 5.1

View 1 Replies View Related

IPhone :: Arranging The Email Accounts?

Apr 1, 2012

I googled all that I can and I'm still very fustrated. I want to be able to arrange my email accounts in a order that I want. Currently my phone chooses to list my email accounts as it sees fit. Now I've tried deleting all of my accounts and adding them in the order that I want them to be in but for some reason the phone just wont let me do this. I have 3 accounts, iCould, Gmail and Hotmail. And they are listed in that order. Now no matter what I do the Hotmail account ALWAYS says on the bottom of the list. Like i said I've deleted them all and added them accordingly but it does not work. I've tired to sync them thru iTunes but it does not show in the info tab.

Gmail
Hotmail

I want it to be in this order;

Hotmail
Gmail
iCloud

Another very annoying thing is that everytime I open the mail app it opens to the iCould account by default. I want it to open to my primary account which is the Hotmail account.

Info:
iPhone 4S, iOS 5.1

View 1 Replies View Related

IPhone :: Set Up Different Ringtones For Email Accounts?

Jun 13, 2012

I have about 6 different email accounts on my iPhone. From exchange server (work email) to my personal yahoo and google accounts plus my personal business account. Is there a possibility to set up different ringtones for each of the emails separately?

I monitor my email very closely as I work for a 24-7 emergency call center and I would like to have a way to differentiate my emails by the rintone assigned to them. My work email goes off all the time, but i can't tell which is which and I hate picking up my phone or stopping what i'm doing for just a junk email.

Info:iPhone 3GS, iOS 5.1.1

View 2 Replies View Related

IPhone :: Create Email Accounts On It?

Jun 21, 2012

Does anyone know how to create a doctors.org.uk email account on iphone?

View 1 Replies View Related

IPhone 5s :: Set Up All Email Accounts Twice - How To Restore

Jun 27, 2014

I have been getting a lot of my emails twice for both my verizon account and my gmail account on my iphone 5s. I will go through and delete emails and then a minute later I will get the same emails back again as unread. However, the ones that I have read and kept, show up as read.Â

I found an answer which led me to believe that when I transferred from my 4s and had trouble with the email accounts I must have set them up twice, although I only see one listing of each account on my device. But the answer didn't explain how to fix the situation. I think it may also be eating up my battery life.

View 1 Replies View Related

How To Delete Old Email Accounts On IPhone

Aug 20, 2014

In my email system on my Iphone I have 3 email accounts on there from a previous job that I no longer use. How can I go about deleting them?Â

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved